Water Supply Engineering Solved Problems Pdf May 2026

Q_avg = 75,000 × 200 = 15,000,000 L/day = 15,000 m³/day (173.6 L/s)

Q_max daily = 1.8 × 15,000 = 27,000 m³/day (312.5 L/s)

Make a mass diagram (cumulative supply – cumulative demand):

Kuichling’s formula: Fire flow (L/min) = 3182 × √P (P in thousands) P = 75 Fire flow = 3182 × √75 = 3182 × 8.66 = 27,556 L/min Convert to m³/day = 27,556 × 1.44 = 39,680 m³/day (459 L/s) 3. Problem Set 3: Pipe Flow – Darcy-Weisbach & Hazen-Williams Problem 3.1 A 400 mm diameter steel pipe (ε = 0.045 mm) carries water at 20°C (ν = 1×10⁻⁶ m²/s) over a length of 800 m. Flow rate = 0.25 m³/s. Calculate head loss using: (a) Darcy-Weisbach equation (b) Hazen-Williams (C=120)